Skip to Content
 

 

       

Accessory Dwelling Units 

 

    

  • WHAT IS AN ADU?
  • CAN I BUILD AN ADU?
  • DESIGN STANDARDS
  • NEXT STEPS
  • FAQS

WHAT IS AN ADU?


The City of Milwaukee defines an Accessory Dwelling Unit (ADU) as a room or set of rooms with its own cooking, sleeping, and sanitary facilities that is located on the same lot as a single-family home or 2-family home. An ADU also has a smaller living area than the main dwelling to which it is accessory.

ADUs are a housing option that can work for just about everyone! Upsizing, downsizing, just starting out, single, divorced, or widowed, families, adult children, aging parents, and extended family. ADUs can also provide additional income from homeowners. 


ADUs come in many different shapes and sizes. Your ADU will fall into one of the following categories:

 

Internal ADU:

An additional residential unit located within the walls of an existing or newly-constructed residence. This could be either a second-story, attic, or basement conversion.

  

        

Attached ADU:

An additional residential unit located in a separate addition to an existing residence.

Detached ADU:

A freestanding residential unit located on the same property containing a separate principal residence. Detached ADUs are commonly known as in-law suites or garage apartments.

 

CAN I BUILD AN ADU?

 

Zoning Districts:

An accessory dwelling unit (ADU) is allowed in the following zoning districts as a Limited Use:

  • Residential Single-Family: RS1, RS2, RS3, RS4, RS5, RS6
  • Residential Two-Family: RT1, RT2, RT3, RT4
  • Residential Multi-Family: RM1, RM2, RM3, RM4, RM5, RM6, RM7
  • Residential and Office Districts: RO1 and RO2
  • Local Business: LB1, LB2, LB3
  • Regional Business: RB1, RB2
  • Neighborhood Shopping: NS1, NS2
  • Commercial Service: CS
  • Industrial: IM

Visit milwaukee.gov/mymilwaukeehome to identify the zoning district for your property. Go to the "Special Interest" section.

 

 

In general, ADUs are allowed when:

  • There is no more than one ADU on each property.
  • The ADU is smaller in gross livable area than the principal residence.
  • Internal ADUs and Attached ADUs are only allowed if the ADU is located in or attached to a single-family residence.
  • Detached ADUs are only allowed if the property has a single-family or 2-family residence.
  • The principal residence on a property is occupied by the owner at the time of submitting a permit.
  • The ADU is not taller than the principal residence.

 

 

Water & Sewer

The current City plumbing code (Milwaukee Code of Ordinances 225-17) and Water Works Service Rules and Regulations (3.1.1) require that each residential structure on a property have a direct connection to a sewer and water main. Detached ADUs permitted by zoning would need a connection to a public or private main sewer separate from sewer main of the principal residence on the property.

 


Lot Coverage & Lot Size

  • In RS1 to RS5 and RT1 to RT3 districts, properties with an ADU may increase their maximum lot coverage by up to 15%.
  • In RT4 and RS6 districts, the same 15% increase in lot coverage is allowed for properties with an ADU, if the lot coverage of accessory structures is reduced by an equal amount.
  • Additionally, ADUs do not count toward the required lot area per dwelling unit for the principal residence.

 

DESIGN STANDARDS


Internal ADU

Attached ADU

Detached ADU

Floor area, minimum

300 sq. ft.

300 sq. ft.

300 sq. ft.

Floor area, maximum

1,000 sq. ft., but not larger than the largest dwelling unit; may exceed 1,000 sq. ft. if structure existed as of the effective date of this ordinance [August 2, 2025]; shall be located entirely on one level and shall not exceed the area of the first floor.

1,000 sq. ft., but not larger than the largest dwelling unit.

1,300 sq. ft. of habitable and parking areas on all levels, or 16% of the lot area, whichever is greater, but not to exceed 1,600 sq. ft. or the floor area of the largest dwelling unit.

Height, minimum

none

none

none

Height, maximum

Same as principal building.

Same as principal building.

Not greater than the height of the principal building on the parcel.

Front setback, minimum

Same as principal building.

Same as principal building.

Not less than the front setback of the principal building on the parcel.

Side setback, minimum

Same as principal building.

Same as principal building.

3 ft.

Rear setback, minimum

Same as principal building.

Same as principal building.

4 ft. from the alley lot line if the accessory dwelling unit building includes a garage with an overhead door facing the alley;
3 ft. if the accessory dwelling unit does not include a garage or includes a garage but the overhead door does not face the rear lot line.

Distance from main dwelling, minimum

Not applicable.

Not applicable.

The front-to-back minimum distance between the 2 buildings shall be 10 ft.
The side-to-side minimum distance between the 2 residential buildings shall be 5 ft.

Pedestrian connections to street frontage

An accessory dwelling unit entry within a rear or side yard shall be connected to a street frontage by a paved walkway or access drive.

An accessory dwelling unit entry within a rear or side yard shall be connected to a street frontage by a paved walkway or access drive.

An accessory dwelling unit entry within a rear or side yard shall be connected to a street frontage by a paved walkway or access drive.

Balconies

Same as principal building.

Same as principal building.

Same as principal building.

FINANCING AN ADU

While there are no loans specific to ADU construction, some homeowners utilize financing tools for home rehabilitation. Others borrow against their home’s equity. Commonly homeowners will use a combination of tools to finance their ADU. Here are some examples of potential financing options. 

 

Cash-Out Refinance:

If your home has gone up in value, you can refinance your mortgage and take out some of that extra value as cash. This gives you money to build your ADU, and you’ll have just one mortgage that covers both your home and the new unit.
 

Home Equity Loan:

Homeowners may choose to take out a second mortgage on their home called a Home Equity Loan. You get a lump sum of money to use for your ADU, and you pay it back with fixed monthly payments. This loan will remain separate from your main mortgage.
 

Home Equity Line of Credit (HELOC):

HELOC opens a line of credit for homeowners for home repairs and additions. Loan holders pay interest on the money borrowed during the construction of their ADU. After the “draw period” ends, the homeowner will begin paying off the total loan amount. It’s flexible for projects with changing costs.
 

Construction-to-Permanent Loan:

Otherwise known as a “one-time close" loan, this financing tool combines the costs of building your ADU with your long-term mortgage. While the ADU is being built, the bank pays your contractor and you pay interest. Once it’s done, the loan turns into a regular mortgage you pay off over 15 or 30 years.
 

203(k) Rehabilitation Mortgage:

This FHA loan helps homeowners pay for repairs or upgrades for single-family homes. You must spend at least $5,000, and your home’s value must be less than the FHA mortgage limit for the area. New detached ADUS are not eligible for this mortgage. 

 

List created September 2025. 

WHAT ARE MY NEXT STEPS?

 

Pre-Submittal

Determine if you can build an ADU.

STEP 1: Identify the zoning of your property by using the interactive zoning map on milwaukee.gov/mymilwaukeehome. Go to the “Special Interest” section.

STEP 2: Determine if the desired ADU meets standards outlined in the Zoning Code (see pages 2-3).

Draft designs to determine the project’s feasibility.

STEP 3: Complete verification of existing principal dwelling unit as owner’s primary residence.

STEP 4: Have an architect/designer create construction drawings.

STEP 5: Request a quote for the construction of an ADU from a local contractor.

STEP 6: If building an attached or detached ADU, obtain a certified survey of your property.

 

Apply for Permit

STEP 7: Submit items for building permit at the Development Center.

  • Four (4) copies of a certified survey showing the proposed construction and yard grades. (Detached or Attached ADU only)
  • Truss drawings and calculations, if applicable.
  • Cost of construction (actual cost of materials and labor to build the home, excluding HVAC, electrical, plumbing, and finishes).
  • Four (4) sets of construction drawings. The drawings must be to scale (1/8” = 1’ scale or larger), and include the following elements:
    • Elevations
    • Floor plans
    • Wall sections/footings/framing
    • Wall bracing information
       

Permit Review & Issue

STEP 8: Permit Review

STEP 9: Permit Issued and Fees Due

Frequently Asked Questions

Open AllClose All
How does an ADU differ from a standard residential unit?

ADUs are not the principal residence on a property and therefore must follow specific design and use standards. For example, ADUs must be smaller than the principal residence and follow owner-occupant requirements.

How many ADUs can I build on my property?

Only one ADU shall be located on a property.

Where can I put an ADU on my property?
  1. Internal ADUs can be built within an existing principal residence.
  2. Attached ADUs can be attached to an existing principal residence.
  3. Detached ADUs can be built as a freestanding structure or attached to an existing accessory structure such as a garage. 
Is initial owner-occupancy of the primary residence required for all types of ADUs (internal, attached, and detached)? What happens if the primary residence and ADU are being built at the same time?

Yes. The exact language from the ordinance is:


“At the time a building permit application is submitted for an accessory dwelling unit accessory to an existing principal dwelling unit, at least one owner of the existing principal dwelling unit shall occupy the existing principal dwelling unit as the owner’s primary residence, except the owner is not required to occupy a dwelling unit on the property at the time a permit application is submitted when a structure containing an accessory dwelling unit is being constructed simultaneously with a new principal dwelling unit structure.”

 

Do ADUs have to meet historic preservation standards in historic districts?

Yes, the Historic Preservation Committee (HPC) has design review and approval for any ADU with exterior changes within historic districts. Detached ADUs would be reviewed under the “Guidelines for New Construction” section of the preservation guidelines. Attached ADUs would be reviewed under the “Additions” section of the guidelines. A public hearing at HPC would be required for any ADU approval that requires exterior changes to the property.

Do ADUs have to follow the guidelines of zoning overlays (e.g. Site Plan Review Overlay Zones, Neighborhood Conservations Overlay Zones, etc.)

Yes, if a parcel is subject to a zoning overlay, additional regulations may apply. Specific overlay standards can be found here.

Are fire escapes for internal ADUs allowed in historic districts?

Approval of an external fire escape would require a public hearing at Historic Preservation Committee (HPC). HPC reviews external fire escapes under the “Additions” section of the preservation guidelines. 

The guidelines state:

"Make additions that harmonize with the existing building architecturally and are located so as not to be visible from the public right-of-way, if at all possible.  Avoid making additions that are unsympathetic to the original structure and visually intrude upon the principal elevation."

Is off-street parking required to build an ADU?

No parking is required in order to build an ADU in addition to what the zoning requires for the princiapl building on the parcel. 

Can I sell my ADU?

No. Since ADUs are accessory to a principal residence, all future transfers of ownership shall include all units on a property.

Can my Detached ADU share water and sewer laterals with the principal building?

No. Each residential structure on a property must have a direct connection to a sewer and water main. 

What public notice requirements are there to build an ADU?

Similar to other uses within the zoning code, a proposal that meets all limited use and design standards is permitted without requiring additional public review. If a proposal does not meet the zoning standards, the applicant would be required to seek a variance from the Board of Zoning Appeals. Variances include a public hearing where neighborhood input could be considered.  

Within locally designated historic districts,  HPC requirements and reviews will continue to apply. 

Where do I go to apply for a permit?

You can submit plans for review in person or by mail. Applications may be filed online at https://milwaukee.gov/lms, though the Cty requires paper project plans.


Permit & Development Center

Department of Neighborhood Services
809 N Broadway
Milwaukee, WI 53202-3617
(414) 286-8210
[email protected]