OVERVIEW

The City of Milwaukee Department of Public Works and State of Wisconsin Department of Transportation are planning to replace East Wells Street from North Broadway to North Prospect Avenue (.44 mile). The scope of work includes removing and replacing deteriorated pavement, curb & guttter, driveway approaches and sidewalk. Pedestrian curb ramps will be built to meet ADA compliance, and we will enhance pedestrian and bike accommodations. Drainage structures, street lighting and traffic signals will also be upgraded.

PROJECT SCHEDULE

We are currently in the design phase through 2023. Construction is tentatively scheduled for 2024. 

GOALS

  • Upgrade pavement conditions
  • Better organize all modes of traffic 
  • Manage driving speeds
  • Improve visibility for all users
  • Make travel safe and comfortable for everyone
FACTS
  • East Wells Street is a connecting highway (STH 32), classified as a minor arterial
  • Average Daily Traffic Count: 2,600-5,200 vehicles
  • Posted speed: 30 mph
  • No existing bus routes
  • Right of Way: 80 ft
  • Roadway Width
    • N. Broadway to N. Van Buren St.: 60 ft
    • N. Van Buren St. to N. Prospect Ave.: 44 ft
FUNDING

Estimated construction cost is $5.5 to $6.0 million dollars. Approximate Breakdown: 

Preliminary Engineering

  • 75% cost covered by State
  • 25% cost covered by the City

Construction Costs

  • 45% cost covered by the State 
  • 55% cost covered by the City
MAPS

Project location map
Archaeological site map
Historic properties and district map 

DESIGN OPTIONS

We have developed several design options using the feedback and input we received from residents and the community from the 1st Public Involvement Meeting held in February 2021. We divided Wells Street into two sections to review:

1. East Wells Street from North Broadway to North Van Buren Street: 2 design options
2. East Wells Street from North Van Buren Street to North Prospect Avenue: 3 design options

Tell us what you think about the options to improve the street. Your input is valuable in selecting the proposed design. 

WELLS STREET FROM NORTH BROADWAY TO NORTH VAN BUREN STREET
EXISTING CONDITION

Existing Fetures:

  • Sidewalk (10 ft)
  • Parking lane on both sides (8.5 ft)
  • On-street bike lane in each direction (5 ft)
  • One driving lane in each direction (11 ft)
  • Turing lane (11 ft)


OPTION A

Option A Features:

  • Public space/seating (5 ft)
  • Sidewalk (8 ft)
  • Terrace (4 ft)
  • Parking lane in each direction (7 ft)
  • On-street bike lane in each direction (5 ft)
  • One driving lane in each direction (11 ft)


OPTION B

Option B Features:

  • Public space/seating (5 ft)
  • Sidewalk (7 ft)
  • Terrace (4 ft)
  • Parking lane in each direction (8 ft)
  • On-street bike lane in each direction (5 ft)
  • One driving lane in each direction (11 ft)

WELLS STREET FROM NORTH VAN BUREN STREET TO NORTH PROSPECT AVENUE
EXISTING CONDITION

Existing Features

  • Clearance (2 ft)
  • Sidewalk (6 ft on north side, 5-8 ft on south side)
  • Terrace (9 ft)
  • Parking lane in each direction (8 ft)
  • One driving lane in each direction (14 ft)

OPTION A 

Option A Features:

  • Clearance (2 ft)
  • Sidewalk (6ft on north side and 5-8 ft on south side)
  • Terrace (9 ft)
  • Parking lane in each direction (7 ft)
  • On-street bike lane in each direction (5 ft)
  • One driving lane in each direction (10 ft)

OPTION B

Option B Features 

  • Clearance (2-3 ft)
  • Sidewalk (6-7 ft on north side and 5-8 ft on south side)
  • Terrace (8 ft)
  • Parking lane in each direction (7 ft)
  • On-street bike lane in each direction (5 ft)
  • One driving lane in each direction (11 ft)

OPTION C

Option C Features

  • Clearance (2 ft)
  • Sidewalk (6 ft on north side and 5-8 ft on south side)
  • Terrace (9 ft)
  • Parking lane on north side only (8 ft)
  • On-street bike lane in each direction (6 ft)
  • One driving lane in each direction (12 ft)

COMMUNITY MEETINGS & DOCUMENTS 

The City of Milwaukee Department of Public Works holds public involvement meetings to receive input and share project details with residents and businesses located in the project area. 

Pre-Construction Meeting - Early Spring 2024
Purpose: Outline construction schedule, staging details, and address concerns of expected impacts


Public Involvement Meeting #2 - June 3, 2021 from 5:00 pm to 7:00 pm

Purpose: Show feasible design options based on initial community feedback
We want you to tell us: How do the proposed designs work for you? Do the proposed designs capture what the community wants? Are we missing anything?

To join on your computer or mobile app (Microsoft teams) - Click here 

If you prefer to call in (audio only): 414-251-0392 and enter access code: 505 434 783#

 


Virtual Public Involvement Meeting #1 – February 9, 2021 from 5:00 pm to 7:00 pm

The purpose of the 1st public meeting is to introduce the project, and gather community experience to start design options. We want you to tell us: How do you get around your neighborhood and where are you going? What problems do you see and experience, while walking, driving, or riding a bike? What do you like about the current street? What dont you like about it? Where is it difficult or dangerous to cross the street? What do you want to see on Wells Street?

To join on your computer or mobile app - Click here to join the meeting

If you prefer to call in (audio only): 414-251-0392 and enter code 61567128#

 

Let us know where you see issues and opportunities for improvement on East Wells Street! Your input will help shape how the road looks and will help identify solutions to make the street safer and more enjoyable for walking, bicycling, and driving. 

Name 

Address

Email 

Select one that best describes your interest in this project:

Comment box

 

PROJECT CONTACTS

Christine Hanna, WisDOT Project Manager
christine.hanna@dot.wi.gov
414-750-1555

David Tapia, Project Manager

dtapia@milwaukee.gov
414-286-2453

Megan O'Connor, Project Liaison
moconnor@milwaukee.gov
414-708-1433