Street Closures and Traffic Restrictions 

Street Closures


NEW DEVELOPMENTS

NORTH 11TH STREET – WEST JUNEAU AVENUE SOUTH TO ITS TERMINUS (4TH) (POLICE DISTRICT 1)
It is anticipated that North 11th Street from West Juneau Avenue south to its terminus will be closed to traffic from 11:00 A.M. to
10:00 P.M. on Saturday, October 16, 2021 for Central Waters Brewing Opening Day Party.

NORTH BARTLETT AVENUE – EAST NORTH AVENUE TO A POINT 200’ SOUTH OF EAST NORTH AVENUE (3RD) (POLICE DISTRICT 1)
It is anticipated that North Bartlett Avenue from East North Avenue to a point 200’ south of East North Avenue will be closed to traffic from 7:00 A.M. to 5:00 P.M. daily from Monday, October 18 to Friday, December 31, 2021, weather dependent, for a roofing project. The roadway will be opened to two-way traffic during non-working hours.

WEST WISCONSIN AVENUE – NORTH WATER STREET TO NORTH PLANKINTON AVENUE (4TH) (POLICE DISTRICT 1)
It is anticipated that this roadway will be closed daily between 1:00 P.M. and 12:00 A.M. from Thursday, October 21 to Sunday, October 24, 2021 as an extended venue for Widespread Panic at The Riverside Theater.


PROJECTS IN PROGRESS

NORTH TEUTONIA AVENUE BRIDGE – LINCOLN CREEK PKWY TO WEST EGGERT PLACE (1ST) (POLICE DISTRICT 7)
It is anticipated that beginning Monday, October 4, two-way traffic will be restricted to one lane for each direction of travel on North Teutonia Avenue from Lincoln Creek Pkwy to West Eggert Place for maintenance work of the North Teutonia Avenue Bridge over the Lincoln Creek River. This work is expected to take one week.

NORTH VEL R PHILLIPS AVENUE – WEST WELLS STREET TO WEST KILBOURN AVENUE (4TH) (POLICE DISTRICT 1)
It is anticipated that North Vel R Phillips Avenue from West Wells Street to West Kilbourn Avenue will be closed to traffic beginning Monday, September 20 and ending Monday, October 11, 2021 (weather dependent) for demolition of the skywalk over North Vel R Phillips Avenue.

EAST NORTH AVENUE – NORTH HUMBOLDT BOULEVARD TO APPROXIMATELY 400’ EAST OF NORTH COMMERCE STREET (3RD) (POLICE DISTRICT 5)
It is anticipated that beginning Tuesday, September 7, 2021 and ending until Tuesday, October 5, 2021 (weather dependent), two-way traffic on East North Avenue from North Humboldt Boulevard to approximately 400’ east of North Commerce Street will be shifted and maintained on the north side of the street for bridge repairs on the East North Avenue Viaduct until further notice. After work on the north side of the street is complete, two-way traffic will be shifted and maintained on the south side of street.

EAST & WEST BECHER STREET – SOUTH KINNICKINNIC AVENUE TO SOUTH 4TH STREET (14TH) (POLICE DISTRICT 6)
It is anticipated that the traffic pattern of East & West Becher Street from South Kinnickinnic Avenue to South 4th Street will change beginning Monday, July 26, 2021. East & West Becher Street will be closed to westbound traffic with eastbound traffic begin maintained in the eastbound lanes; a staging switch will follow with eastbound lanes being maintained in the westbound lanes. This work is expected to conclude in November 2021.

WEST FLORIST AVENUE – NORTH 76TH SREET TO NORTH 66TH STREET (2ND) (POLICE DISTRICT 4)
It is anticipated that beginning Tuesday, June 1st, two-way traffic on West Florist Avenue from North 76th Street to North 66th Street will be shifted to the north side of the street for a WE Energies project for approximately eight weeks. The traffic pattern will change again following this stage of construction.

WEST BROWN DEER ROAD – NORTH 91ST STREET TO NORTH ARBON DRIVE (9TH) (POLICE DISTRICT 4)
It is anticipated that the traffic pattern of West Brown Deer Road from North 91st Street in the City of Milwaukee to North Arbon Drive in the Village of Brown Deer will change beginning the week of April 19, 2021 for a WisDOT roadway rehabilitation project. Two lanes of traffic for each direction of travel will be maintained during peak rush hours; traffic will be reduced to one lane in each direction during mid-day, evening and weekend hours. This work is expected to conclude by the end of 2021.

WEST VILLARD AVENUE – BRIDGE OVER LINCOLN CREEK (1ST) (POLICE DISTRICTS 4, 7)
It is anticipated that traffic on West Villard Avenue over the Lincoln Creek Bridge (approximately between North 22nd Street and North 25th Street) will be restricted to one lane of traffic for westbound travel only beginning Monday, March 22 and continuing until Summer 2021 for a bridge reconstruction project. The traffic pattern will change again following this stage of construction.

NORTH MARKET STREET – EAST WELLS STREET TO APPROXIMATELY 200’ NORTH OF EAST WELLS STREET (4TH) (POLICE DISTRICT 1)
It is anticipated that North Market Street will only be accessible to vehicular traffic from East Kilbourn Avenue beginning Saturday, July 18, 2020 and continuing until Summer 2023 for the next phase of the City Hall Foundation Restoration Project. Access to Lower Parking will be maintained for the duration of the closure.

NORTH WATER STREET – EAST WELLS STREET TO EAST KILBOURN AVENUE (4TH) (POLICE DISTRICT 1)
Beginning Saturday, February 23, 2019, and continuing until July 2020, the east sidewalk and the entrance to City Hall on North Water Street will be closed. There will also only be one northbound traffic lane on the proper side of the road. A pedestrian walkway will be in place on North Water Street.

This site is powered by the Northwoods Titan Content Management System

Menu

X