Former Northridge Mall Asbestos and Hazardous Materials Abatement and Building Demolition Project
The bid period is closed. These are the submitted bids received prior to 9:01 A.M. on 6/24/24:
- Veit: $10,682306.85 (apparent low bid)
- MRD Group: $10,879,000
- McDonagh: $11,939,085
- New Berlin Grading: $11,950,000
- HM Brandt: $13,198,295
- Jackson Demolition: $13,244,050
- Brandenburg: $14,958,545
- Dore and Associates: $15,846,850
This Table of Contents lists all documents under this project. Please note the addendums:
Addendums (Updated 6/17/23)
- Northridge Questions and Answers 3
- Pre-Demolition Lead-Based Paint and Hazardous Materials Assessment Report
- Revised Bid Bond Form
Addendums (Updated 6/10/24)
- Addendum Information
- Updated Pages:
- Unit Price Sheet (Bid Opening 6/24/24)
- Northridge Questions and Answers 2
- Bid Addendum 2
- Northridge Fountain Pit
- Pages from Architectural Part 2
- Pages from Grand Court
- TRC Fireproofing Inventory
Addendums (Updated 5/31/24)
- Questions and Answers from Initial Bid Tour
- Unit Price Sheet
- Northridge Apprenticeship Information
- Blue Tower Photo
- 8110 W Brown Deer (Menards) Plan Set
- D-002 Site Demolition Plan
- Invitation for Bids for Abatement and Mechanical Demolition
- Building Floor Plans and Layout
- Architectural Drawings (Part 1), Architectural Drawings (Part 2), Architectural Drawings (Part 3), Architectural Drawings (Part 4), Architectural Drawings (Part 5), Architectural Drawings (Part 6), Architectural Drawings (Part 7)
- Building Floor Plans and Layout (Part 1), Building Floor Plans and Layout (Part 2), Building Floor Plans and Layout (Part 3)
- City Records Files (Part 1), City Records Files (Part 2), City Records Files (Part 3), City Records Files (Part 4), City Records Files (Part 5), City Records Files (Part 6)
- Electrical Drawings
- Fire Hydrant Loop Map
- Fire Protection Drawings
- Food Court (Part 1), Food Court (Part 2), Food Court (Part 3), Food Court (Part 4), Food Court (Part 5)
- Grand Court (Part 1), Grand Court (Part 2)
- Granville Plaumbing Drawings
- Mechanical Drawings
- Structural Drawings
- Pre-Demolition Asbestos and Hazardous Material Reports
- Pre-Demolition Asbestos Inspection Report — Former JC Penney Store
- Pre-Demolition Lead-Based Paint and Hazardous Material Report — Former JC Penney Store
- Pre-Demolition Asbestos Inspection Report – North Atrium (Part 1), Pre-Demolition Asbestos Inspection Report – North Atrium (Part 2), Pre-Demolition Asbestos Inspection Report – North Atrium (Part 3)
- Pre-Demolition Regulated Materials Inventory Report – North Atrium
- Pre-Demolition Asbestos Inspection Report – South Atrium (Part 1), Pre-Demolition Asbestos Inspection Report – South Atrium (Part 2), Pre-Demolition Asbestos Inspection Report – South Atrium (Part 3), Pre-Demolition Asbestos Inspection Report – South Atrium (Part 4)
- Pre-Demolition Hazardous/Regulated Materials Assessment – South Atrium
- Limited Hazardous Materials Survey Report – Former Younkers Store
- Pre-Demolition Lead-Based Paint Assessment Reports
- Site Demolition Plans
- We Energies Documents