The Westin Milwaukee is a 9-story hotel located just steps from the waterfront in the heart of downtown. The brand new building opened in June 2017 and offers professional meeting spaces, an Italian-inspired restaurant with bar, a fitness studio, pet-friendly perks, and 220 rooms accommodating up to 400 guests - not to mention extensive event spaces.
The Westin Milwaukee was the first new construction PACE project in the country and is managed by White Lodging. Consistent with The Westin reputation as one of Marriott’s greenest brands, The Westin Milwaukee was designed with nature in mind. The interior features colors derived from nature, an abundance of natural light, and even a living green wall in the lobby. The solely locally-sourced selection of Wisconsin beer in the restaurant bar and on-site laundry are additional ways that the hotel is able to cut back on their carbon emissions in pursuit of sustainability.
Being green is just good business sense - not only are guests generally interested in sustainability, but financially it has benefited us through the use of PACE funding and by cutting energy and operational costs. Doug Nysse, Principal, Arrival Partners, LLC
Having just opened in the summer of 2017, it will take some time for The Westin Milwaukee to stabilize their energy usage and to establish an energy baseline. The building management team currently manages the building data using excel spreadsheets and physical walk-throughs, but they look forward to working with the Better Buildings Challenge to set up an ENERGY STAR® Portfolio Manager® account to assist with data tracking very soon.
Plug Loads & Controls
Building Envelope
Appliances & Equipment
On-Site Generation
The Westin Milwaukee looks forward to establishing an energy use baseline in the near future in order to continue working towards energy efficiency.
Address 550 N Van Buren St Milwaukee, WI 53202
Year Built 2017
Size 177,000 sq ft
Building Type Hotel
Owner JSWD Wisconsin Venture I
Website westinmilwaukee.com
Joined Pledge 2016
Goals: 20% reduction in Energy Use Intensity by 2026
Baseline 2017
Program Participation
Project Types
Project Highlight: Water Source Heat Pump
Compared to the standard PTAC (package terminal AC), building management at The Westin Milwaukee decided to take their HVAC to the next level by installing high efficiency WSHPs - capable of 13.1 EER and 4.6 COP in cooling and heating mode.
Building Contact
Doug Nysse President Arrival Partners, LLC [email protected] (414) 212-5494
Why Participate?
The Westin works hard to incorporate wellness and deliver quality within their buildings. They took the Better Buildings Challenge pledge in order to utilize PACE financing and to demonstrate environmental and financial responsibility.