Construction Site Mulching

 

CONSTRUCTION SITE MULCHING

 

 

Code References

  • "All disturbed ground left inactive for 10 or more days shall be stabilized by seeding or sodding, or by mulching or covering, or other equivalent control measure." (Reference: Section 290-7.2.e-3 of the City Code of Ordinances).
  • "If {soil or dirt storage piles are} remaining for more than 10 days, they shall be stabilized by mulching, vegetative cover, tarps, or other means." (Reference: Section 290-7.2.e-6 of the City Code of Ordinances).

 Quick Tips

  • Mulch shall be inspected weekly at minimum and within 24 hours after a precipitation event of 0.5 inches or greater.
  • Displaced mulch shall be reapplied and properly anchored.
  • Mulch shall be placed within 24 hours of seeding.
  • Mulch shall cover a minimum of 80% of the soil surface for unseeded areas and at least 70% of the soil surface for seeded areas.
  • The anchoring of mulch shall be based on the type of mulch applied, site conditions, and accomplished by crimping, netting, or tackifiers.

Applicable Standard

Related Weblinks

 

Back to Basic Control Measures